Dates Receiving & Initial Inspection
Incoming dates are received, visually inspected and checked for damaged fruit or visible foreign material before processing.

MUSCAT PACKING MACHINES / OMAN
MPM Dates Production Line in Oman combines inspection, sorting, washing, controlled drying, manual loading and vacuum packaging options for industrial date-processing projects.
Equipment scope matched to your product and output targets
Options for coordinated process flow and factory planning
Installation, commissioning and training within the agreed scope
From process design to the finished pack, the right configuration starts with the product and its operating conditions.
Muscat Packing Machines (MPM) supplies project-oriented dates processing and packaging solutions for producers in the Sultanate of Oman. Each Dates Production Line is configured around the date variety, product condition, hygiene requirements, production target and selected retail pack. This page presents a proposed process concept, not a fixed catalogue machine or a guaranteed turnkey specification.
The proposed workflow begins with receiving and visual inspection, followed by sorting, suitable washing and sanitizing, and controlled draining or drying. Operators then prepare and manually load the dates into the selected packaging format. The actual layout, number of workstations and sanitation method depend on sample trials and the factory’s requirements.
Two 1 kg presentation options can be evaluated: pre-made vacuum bags and thermoformed vacuum packs. In both cases the dates are placed into the packs manually; automatic date weighing, dosing or feeding equipment is not included in this proposed scope. Vacuum performance, packaging materials, product presentation and seal integrity must be demonstrated through trials before a final equipment selection.
For a reference thermoforming format, preliminary pack information includes a 210 × 150 mm outside dimension, approximately 190 × 130 mm internal cavity, 45 mm depth and 10 mm flange, with two packs per cycle. These are project reference dimensions subject to tooling drawings, sample approval and machine selection; they are not universal specifications for every line.
One previously discussed project target was 75 tonnes of dates per month, based on 26 working days and one eight-hour shift per day. That corresponds to an average required throughput of approximately 361 kg per operating hour before downtime, process losses, cleaning and changeovers. The correct machine capacities must be determined from the line balance, actual product behavior and the split between vacuum-bag and thermoforming formats.
For semi-dry, pitted Medjool dates, process design should account for handling damage, hygiene, moisture condition, sanitation efficacy, draining and drying, package seal quality and storage conditions. A 24-month shelf-life objective was discussed for the reference project; this is a target for laboratory validation and packaging studies, not a shelf-life guarantee by MPM.
MPM can review the machine arrangement, factory utilities, workflow, commissioning and training requirements as part of the agreed supply scope. Final quotations identify the included machines, agreed specifications, boundaries of supply, performance acceptance criteria and any optional equipment. Machine models, electrical ratings, footprints and production speeds are confirmed only after technical evaluation.
Share your date variety and condition, required capacity, pack type and dimensions, packaging materials, factory space and available utilities. MPM will assess a suitable Dates Production Line for Oman and discuss the technical and commercial proposal with your team.
A configurable dates processing and vacuum-packaging line for Oman. The reference project considers semi-dry, pitted Medjool dates, washing/sanitizing, sorting, controlled drying, and two possible 1 kg packaging formats with manual product loading.
Share the product characteristics, required capacity, package format and site constraints. MPM can evaluate suitable machinery and integration options for your project in Oman.
APPLICATION
Food, beverage, pharmaceutical and industrial processes
SCOPE
Equipment selection, technical proposal and integration options
Incoming dates are received, visually inspected and checked for damaged fruit or visible foreign material before processing.

Dates are sorted by the agreed quality criteria; inspection arrangements and any grading equipment depend on the incoming product.

A product-compatible cleaning and sanitizing step is considered to reduce surface contamination. Process parameters require trials and food-safety validation.

For the pre-made bag format, manually loaded bags are vacuum sealed using equipment selected for the agreed bag film, dimensions and product behavior.

For thermoformed trays or pockets, the machine forms the package; operators manually place dates before the selected sealing/vacuum sequence. Tooling is matched to approved pack drawings.

Manual inspection and sorting arrangement. Conveyor or grading mechanisms, if required, are defined after the product-handling review.
A suitable washing system for the date variety and condition, with hygienic construction and controllable product handling; exact model and capacity remain to be selected.
Drying or draining equipment designed to remove residual washing water without an unverified heat treatment or moisture-reduction claim.
Operator work areas for portion preparation and manual loading of pre-made vacuum bags or thermoforming pockets. Automatic weighers and feeders are excluded.
Vacuum packing equipment for pre-made 1 kg bags, selected after validation of film, seals, bag size and cycle requirements.
Form-fill-seal/vacuum thermoforming equipment for the approved 1 kg pack concept; dates are manually loaded into formed pockets, with final tooling confirmed after samples.
Planning reference: 75 tonnes/month, 26 days/month, 8 hours/day (~361 kg/h average required throughput). Final capacity depends on line balance, downtime, sanitation and allocation by pack format.
Pitted, semi-dry Medjool dates were specified for the reference project. Cleaning parameters and equipment handling must be validated against actual samples.
1 kg pre-made vacuum bags or 1 kg thermoforming vacuum packs. The production split between the two formats has not been confirmed.
Preliminary outside dimensions 210 × 150 mm; cavity 190 × 130 mm; depth 45 mm; flange 10 mm; two packs per cycle. All dimensions and tooling are subject to final approval.
Washing/sanitizing is part of the proposed process. A 24-month shelf-life objective requires product-specific microbial, packaging and storage validation; no guarantee is implied.
Electrical supply, compressed air, water/drainage, machine footprint, line speed and equipment models are to be confirmed in the final technical quotation.
Please confirm the share of monthly output assigned to pre-made vacuum bags versus thermoforming packs; date samples and incoming quality; film/pack samples; acceptance criteria; target sanitation method; available utilities; factory layout; operating temperature and storage requirements.
MPM will review process-flow and machine-layout requirements and define the equipment, utilities interfaces, installation, commissioning and training deliverables in the final technical and commercial quotation. Machine brands, models, verified capacities and supply boundaries are not final until approved.
Both routes can be considered within the project, but each uses suitable packaging equipment. The final arrangement and shared process sections depend on the required production split.
No. The current concept assumes manual preparation and loading. Automatic date weighing, dosing and feeding are excluded unless specifically agreed in a revised quotation.
Washing/sanitizing is a required process consideration for the reference application. The exact technology, disinfectant, dwell time and validation plan are determined after product trials and food-safety assessment.
The 75-tonne-per-month figure is a reference project target, not a guaranteed output. Actual equipment sizing requires confirmation of operating hours, downtime, date properties and package mix.
No. The 24-month figure is a target that must be established through appropriate laboratory studies, microbiological assessment, packaging validation and controlled storage conditions.
Not in the base concept. Production-date marking on thermoformed packs may be reviewed separately if required; standalone coding, checkweighing, metal detection, conveyors and carton sealing are excluded unless later added to the agreed scope.
Tell us about your product, production targets and factory requirements. Request a tailored technical proposal rather than a generic machine list.
Illustrative imagery or configurations, when used, do not represent an executed MPM project unless explicitly identified as such. Final equipment scope is defined in the technical quotation.
Technical concept only. 75 tonnes/month and 24-month shelf life are reference project targets, not guaranteed machine performance or validated shelf life. Pack dimensions require tooling approval. No automatic date weighing or loading in the present concept.